Client:
GPT Group
Project:
Management of Defects and Warranties Schedule
FMX were engaged by GPT to manage the Principal Contractor through their Defects Liability Period under the contract. This project leveraged our construction experience to identify, document and initiate works for building defects. Our team managed all rectification works and inspections during DLP.
The project required FMX to cross check all design drawings on the scope to the physical build to identify variances. Our team also implemented a warranties schedule and associated critical dates program to ensure there was a process to flag future expiration of warranties.